新闻动态
坡面开挖、整平按设计高程、宽度和深度

坡面开挖、整平按设计高程、宽度和深度,开挖压顶、坡脚槽、匡格槽。机械开挖时的应预留 10cm 由人工开挖,多余土方运出指定位置。

Excavation and leveling of slope surface shall be conducted according to the design elevation, width and depth, and the top pressing, toe groove and menu groove shall be excavated. When mechanical excavation, 10cm shall be reserved for manual excavation, and the surplus earthwork shall be transported out of the designated position.

生态框格护坡槽开挖在开挖过程中,经常测量校核开挖平面位置、标高、控制桩号、边坡坡度等是否符合设计图纸要求;浇筑框格砼时,应注意防止混凝土的分层离析,在斜坡上浇筑混凝土应采用斜槽、溜管等下料。

During the excavation of ecological frame slope protection groove, it is necessary to measure and check whether the excavation plane position, elevation, control stake number and slope slope meet the requirements of design drawings; when pouring frame concrete, attention should be paid to prevent the separation of concrete layers, and inclined chute and chute shall be used for concrete pouring on the slope.

生态框格护坡模板安装土工布剪裁整齐,尺寸应准确,缝合的宽度一般为 0.1m 以上,搭接宽度一般为 0.2m 以上,施工白钢雕塑 小型滚揉机 防火电缆 托辊设备 水刀切割机  铜钟 石雕狮子  校园不锈钢雕塑 扭王块模具中严禁接头错动;铺设土工布铺设土工布施工人员穿橡胶平底鞋施工,不准使用带尖头的钢筋作撬动工具和尖头锹平整垫层等,严禁在土工布上堆放块石和敲打石料,杜绝一切可能引起土工布损坏的施工作业;在土工布上铺 10cm 厚的中、粗砂作反滤层。

The geotextile for slope protection formwork of ecological frame shall be cut neatly and the size shall be accurate. The width of stitching is generally over 0.1M, and the overlap width is generally 0.2m Above, joint dislocation is strictly prohibited during construction; laying geotextile laying workers shall wear rubber flat shoes for construction, and steel bars with sharp heads shall not be used as prying tools and sharp spades to level cushion, etc., and it is forbidden to stack block stones and knock stones on geotextile to prevent any construction work that may lead to damage of geotextile; lay 10cm thick medium and coarse sand on the geotextile as anti filter layer.

铺设砂垫层制好生态混凝土的浇筑温度、浇筑次序、浇筑速度,确保生态商品混凝土质量;要求混凝土外表平整,振捣适宜,不呈现沉降现象,控制好浇筑厚度(一般 10~15cm)。浇筑后掩盖,养护 7~14d,依据天气状况洒水,保证混凝土湿度和温度,减少裂缝的产生。

The pouring temperature, pouring sequence and pouring speed of ecological concrete shall be well laid with sand cushion to ensure the quality of ecological commercial concrete; the concrete surface shall be flat and vibrated properly without settlement, and the pouring thickness shall be controlled (generally 10-15cm). Cover up after pouring, maintain for 7-14 days, spray water according to weather conditions to ensure the humidity and temperature of concrete and reduce the occurrence of cracks.

联系方式

  1. 保定巨盛模具制造有限公司
  2. 电话:13833064090
  3. 电话:15188633222
  4. 联系人:高经理
  5. 地址:河北省保定市清苑区阎庄乡中阎庄村

版权 © 保定巨盛模具制造有限公司 网址:www.hupomojuc.cn  推荐:拱形护坡模具,连锁护坡砖模具,生态护坡模具

友链 护坡砖模具 护坡模具 盖板模具 一次性止血带 网站建设及优化:遨游网络